804-303-4507 ame@impreg.com

Cleveland Brick “Egg” Profile

Difficult Challenges Don’t Stop Successful “Egg” Brick Profile Pipe Rehabilitation Project in the Heart of Downtown Cleveland

Facts

Diameter

Length

Wall Thickness

Project Photos

Project Solutions

Installation of an Elliptical “Egg” UV Sewer Lining project located in bustling downtown Cleveland, Ohio. The rehabilitated wastewater sewer system was originally built in the 1890’s

This rehabilitation project, in the heart of the city, was near major attractions including the Home of their NBA’s Cavaliers, Rocket Mortgage Fieldhouse, MLB’s Cleveland Guardian’s Progressive Field, the Jack Casino and the popular E 4th Street entertainment district. 

The sewer rehabilitation and 61 lateral reinstatements were completed in 4 phases:
First Phase: 296 Feet
Second Phase: 300 Feet
Third Phase: 394 Feet
Fourth Phase: 354 Feet

“The lateral opening in an egg shape was very challenging and is not common in the U.S. The crew did a great job overcoming all the obstacles.” – Patrick Willems

More IMPREG Case Studies

Start Your Project!

9 + 10 =

IMPREG Group worldwide

IMPREG LLC is a subsidiary

of the IMPREG Group

Office

IMPREG LLC

8000 Whitepine Road

Richmond, VA 23237

Follow Us