Dec 8, 2021 | Case Studies IMPREG
Box Culvert Rehabilitation IMPREG Liners are specially designed to make the complex, simple.Any pipe diameter, any pipe shape, IMPREG has the rehabilitation solution. Facts Diameter Length Wall Thickness Project Photos Project Solutions A case study showcasing why...
Nov 28, 2021 | Case Studies IMPREG
Brick Culvert Rehabilitation Making brick culvert rehabilitation look easy with IMPREG UV-Technology Solutions: 85′ (26m) of a 36″ (DN900) brick culvert, installed and winched in from the same side. 0.7″ (18mm) thick liner. Facts Diameter Length Wall Thickness Project...
Nov 28, 2021 | Case Studies IMPREG
Cleveland Brick “Egg” Profile Difficult Challenges Don’t Stop Successful “Egg” Brick Profile Pipe Rehabilitation Project in the Heart of Downtown Cleveland Facts Diameter Length Wall Thickness Project Photos Project Solutions Installation of an...
Nov 28, 2021 | Case Studies IMPREG
72″ Pipe Rehabilitation Setting a World Record (New York) in Trenchless Cured-in-Place Pipe (CIPP) Wastewater Infrastructure Restoration Facts Diameter Length Wall Thickness Project Photos Project Solutions The World’s Largest Installed CIPP Rehabilitation in 2018 was...